Tomings

CASES

Sand Ore Production Line Was Put Into Trial Operation

Views :
Update time : 2024-12-04

Malaysia sand ore production line with annual output of 3 million tons was put into trial operation

sand making line.jpg

Construction stone Mine is located in Malaysia, with reserves of 5.2474 million tons. The main product specifications of the stone ore production line are stone powder, machine-made sand (0-5mm) and aggregate products (5-10mm, 10-20mm, 20-31.5mm), with a production capacity of 1000 tons/hour. The calcium oxide content in the ore is rich, and it can also be supplied to steel smelting and chemical enterprises.


The project is a limestone mine, this project used C6X jaw crusher, CI5X impact crusher, S5X vibrating screen and VU aggregate optimization system and other equipment.


It can better meet the needs of construction stone for municipal, highway, water conservancy facilities and other construction projects.



Related News
Read More >>
Sand Ore Production Line Was P Sand Ore Production Line Was P
12 .04.2024
Malaysia sand ore production line with annual output of 3 million tons was put i
Cement production line project Cement production line project
11 .24.2024
The tomings has completed more than 20 cement production line projects, exported